One partner for all your work

DCO Construction · for businesses and property managers

One team for all work on your building

Maintenance, repairs, construction, finishing and building services. For a single job or several types of work combined – in any building, from small business premises to an industrial site.

Our full range of services

You can also turn to us for this work

Do you know DCO for just one type of work? Explore our other services too. You can entrust us with a single job or several jobs together.

Maintenance & repairs

For day-to-day problems, planned maintenance and repairs to your buildings.

Construction & site works

From alterations and extensions to foundations, drainage and concrete repairs.

Finishing & fit-out

For the fit-out, refurbishment and finishing of your business premises.

Plumbing & building services

Water, heating, ventilation, climate control and electrical installations.

Access & fencing

From site boundaries to automatic access and parking control.

Building & technical works

How we bring your business project together

Foundations, structures and connections are all part of the same project. DCO carries out these elements together, rather than just one isolated job.

General Building Works

General Building Works

Extensions, outbuildings, walls or other structures needed for the use of your building.
Concrete Works and Concrete Repairs

Concrete Works and Concrete Repairs

Pouring foundations and concrete floors, and repairing damaged concrete structures using techniques that ensure durability.
Earthworks & Drainage Works

Earthworks & Drainage Works

Preparatory works, excavation, drainage pipes and installation of drainage systems in accordance with applicable standards.
Building Maintenance

Building Maintenance

Technical repairs and structural maintenance for flats, business premises and industrial buildings.
Painting

Painting

Professional interior and exterior painting as part of renovation or repair projects.
Joinery

Joinery

Installation and repair of partitions, cabinets, additional rooms and other timber structures.
Interior Finishing

Interior Finishing

From plastering to flooring — we ensure a high-quality, neat finish.
Windows and Doors

Windows and Doors

Installation of timber or aluminium windows and doors, burglary protection and insulation.
Fencing

Fencing

Installation of fencing for businesses, industrial sites and other buildings.
Plumbing

Plumbing

Installation, repair and replacement of sanitary fittings, pipes and drains for businesses and buildings.
HVAC

HVAC

Climate control through heating, ventilation and cooling with energy-efficient solutions.
General Electrical Works

General Electrical Works

Installation, refurbishment and inspection of electrical systems in homes and business premises.
Electrical Substations

Electrical Substations

Installation of high-voltage substations, including infrastructure and inspection — in cooperation with DCO Elektrotechniek.
Automatic Gates

Automatic Gates

Installation and repair of automatic sliding or swing gates and sectional doors for homes and businesses.
Barriers and Bollards

Barriers and Bollards

Security solutions for access control at business parks and parking areas.