One partner for all your work

Construction and technical work by DCO Construction

Construction projects for businesses · Genk

Construction company in Genk for infrastructure around your business installations

DCO Construction carries out building and electrical works in Genk that together support the infrastructure of a business site. For a generator, for example, you can discuss foundations, cabling and fencing together; supplying the generator is not included in this scope. We have completed several large projects in Genk and tailor each new assignment to the specific installation and site conditions.

+32 493 45 83 12

Why construction projects in Genk call for a tailored approach

The city describes Genk-Zuid as a business park with industrial and logistics companies and connections by road, rail and canal. This multimodal environment makes it clear why business infrastructure here involves more than the building alone. The position of an installation, its connection to the building and the demarcation of the surrounding space can also form part of a construction enquiry. However, the surroundings alone do not establish the requirements for your individual plot.

A technical installation on your business site involves several types of work. DCO can combine foundations, walls, posts, fencing and electrical cabling or connections. Consider where the installation will be located, how it will connect to the building and how much space around it needs to remain available. Your project details determine which elements are needed. An installation at a logistics site is not automatically prepared in the same way as an installation at another business. First, the function, available information and limits of the brief are discussed; only then can the scope of the works be defined in detail.

City of Genk — Bedrijventerrein Genk-Zuid

Distinguishing the generator itself from the works around it

When having a generator installed, there is generally more to organise than the choice of equipment. The layout, supporting structure, electrical connection and any protective barriers need to be clearly defined. These are separate elements that nevertheless need to work together. DCO provides infrastructure around generators, including foundations, cabling and fencing. This does not mean supplying the generator or determining all its specifications.

You should therefore request the available information from the party supplying the equipment in good time. This includes the planned position, connection information and details needed to discuss the preparatory building works. Also indicate what has not yet been finalised. A dimension or connection point that changes later may affect work you intended to have carried out earlier. Explicitly allocating responsibilities makes it clear which information comes from the supplier and which works DCO includes in the quotation. This creates a clearer scope of work than summarising the entire project under a single undefined term.

Preparing a substructure based on known project details

A foundation is not a standalone product that you choose solely on the basis of a place name. Preparations depend on the planned installation, its location on the site, available plans and conditions on site. Where information is missing, it must first be clear who will provide it and which decisions depend on it. Without that information, it makes little sense to assume a particular construction build-up.

DCO can include foundation and concrete works as part of the infrastructure for your business project. You should also discuss the components that will later be placed on or alongside that substructure. A post, fence or connection route may affect the space that needs to remain clear. Provide available site plans and information about the existing substructure. Indicate where work has previously been carried out and what information is available about it, so that it becomes clear which details are still needed for the new works. This keeps the discussion focused on the information that determines how the work will be carried out and the steps needed before construction can begin.

Considering cabling as a connection between two known points

A cable route becomes clearer when both its starting point and endpoint are described. Where is the existing connection, where will the installation be located and which areas lie between them? If either of those points changes, the route should also be reviewed. A line on a sketch is a starting point for discussion, not proof that the cable can be laid along that route without further assessment.

In a combined project, DCO can handle electrical cabling and connections together with the building works. This means the connections are addressed before the surrounding components are fully finished. Mention known existing utility lines and provide available plans, without making assumptions about unknown conditions yourself. The intended scope of the electrical work must also be clear: which connection forms part of the request and which components will be handled by another party? Agreements of this kind prevent uncertainty about the scope of work, while allowing technical choices to be discussed on the basis of concrete information.

Designing the enclosure around use and accessibility

Fencing around an installation affects the space around it. You need to know not only which area you want to enclose, but also how the installation must remain accessible to the parties involved. The gate or opening in a fence should therefore not be left until the end of the discussion. Specify who needs access and which activities must be possible there, without setting unconfirmed technical clearance distances yourself.

DCO can combine fencing with foundations, posts and electrical works. If lighting is also required, it should be included in the same overview. After all, the boundary, the supports and the cable route may occupy the same available space. Discussing how the works will be carried out together helps make these interfaces clear. The outcome you request remains specific: an agreed area with defined works. You should therefore record which area will be enclosed, where access will be provided and which lighting forms part of that enclosure.

Adding lighting points without overlooking the building works

A lighting point near an installation can help make the area concerned usable after dark, but its intended function must first be clear. Is it intended to light an access point, a work area or the surroundings of an enclosure? Describe what you want to be able to see and use. Deciding on the location and the associated works requires more than simply specifying a number of light fittings.

For lighting and security, DCO can combine the foundations, walls or posts with the electrical connection. This allows you to include the substructure and power supply in your request at the same time. Indicate whether supports are already present and what information is available about them. Existing components are not automatically assumed to be suitable for a new application. When lighting forms part of a wider generator project, its relationship with the fencing and access arrangements will also be discussed. This keeps all the works tied to the actual use of that particular area, rather than to a general promise about site lighting.

Bringing supplier information and work schedules together

Infrastructure around a piece of equipment often involves several parties, even when DCO combines various construction activities. The equipment supplier may need to confirm details, your organisation must make a location available and the preparatory building works must be completed at the right time. You should therefore make clear which decisions need to precede which works. A planned delivery date alone is not enough if the necessary connection details are still missing.

A practical overview states who will provide which information, which parts of the site are available and who may approve changes. Also discuss which activities near the works will continue and which need to be temporarily adapted. Discuss which activities need to be temporarily suspended or relocated, who will clear the area and when the relevant components will be available for the work to proceed. If the layout of the installation changes, the consequences for the foundation, cable route and fencing must be considered together. This prevents different parties from continuing to plan using different versions of the project.

How much does a construction project in Genk cost?

For site infrastructure, the cost is partly determined by the extent of the substructure, the cable route and the chosen enclosure. The condition of the work area, accessibility for carrying out the works and the amount of existing infrastructure to be retained can also have an impact. For works around a generator, the information available in advance and how the works fit in with delivery and installation by other parties involved also make a difference.

Request a quotation for the infrastructure you actually want built, with a separate description of the installation it relates to. Include the known location, plans, relevant supplier information and desired connections. Indicate which choices are provisional. A proposal can then describe more clearly what is included and where further coordination remains necessary. Do not just compare the totals of different quotations: check whether they cover the same foundation works, cabling and fencing. The purchase of a generator should not be assumed to be included in a quotation for the civil and electrical infrastructure around it.

Infrastructure requirementWhat affects the budgetContents of the request
Preparing the generator setupRequired base structure and available equipment specificationsFoundation; generator supply not included
Connecting the installation electricallyLocation of the starting point and end pointCabling and agreed connections
Enclosing and lighting the areaNumber of supports involved and extent of fencingPosts, fencing and power supply for lighting

Presenting a specific site requirement in Genk to DCO

Based at Fabrieksstraat 108, 1930 Zaventem, DCO Construction works throughout Belgium, including on projects for businesses in Genk. We have completed several large projects in the city. Start your enquiry by describing the function of the installation and its position on the site. With the known equipment specifications, an overview of existing connections and details of the boundary you would like, the discussion can focus on the interrelated works.

Begin your message with the function of the new or modified infrastructure. Then describe the intended location, its relationship to the building and the elements you want DCO to handle. You may only need a base structure with cabling; fencing, posts and lighting may also form part of the work. Also specify what a supplier or another contractor will handle. This provides a useful starting point for defining the scope of the work. From there, the discussion can cover the information needed, the sequence of works and a suitable proposal for the combined civil and technical works.

Clarity on your installation project

An installation project requires information about the business site and from the equipment supplier. Distinguish in advance between the equipment, its foundation, the electrical connection and the enclosure.

This page concerns the infrastructure around a generator, not the supply of the equipment. DCO can provide foundations, cabling and fencing. Indicate who will supply the generator and what information that party has available. This allows the scope of the civil and electrical works to be agreed, without confusing supply with preparatory works.

Request the information describing the selected setup and connections, including available dimensions and relevant installation information. Submit these documents unchanged with your request and indicate which version is final. DCO will discuss what additional information is needed for the requested works. You should not guess missing equipment specifications yourself just to make the preparation seem quicker.

First establish the available installation space, the connection to the building and the access required. Ask the supplier which installation specifications apply to the equipment and include them in your request. DCO will then discuss how these relate to the foundation, cable route and any enclosure. Also identify which existing elements will remain in place, so that preparation is based on the space actually available.

That may be an option for phasing the work, but raise the implications in advance. The available space, position of posts and access required can affect the other works. Therefore, mention any future enclosure you would like as part of the project, even if its implementation has not yet been decided. This makes it possible to assess which decisions are needed now and which can genuinely remain open until later.

Communicate the change with an updated drawing or a clear description and indicate which previous information no longer applies. Relocating equipment can affect the supporting structure, cable route and enclosure. These implications must be considered together before further details of the affected works are finalised. Also discuss with your supplier which information needs to be reconfirmed, so that all parties work from the same layout.

Map out the infrastructure around your installation

Send DCO the available information about your business site in Genk. Together, we will discuss the foundations, cabling and enclosure you wish to include in a single works contract.